Season 1, Episode 4
It Would Mean Turning Our Backs on Fukushima
Air Date: 2023-06-01
Overview: With the power still down, the valves will have to be opened manually. With heavy hearts, some workers ask if they can evacuate to a safer location.
Runtime: 56 minutes
3.7 / 5