Tommy Walsh's Eco House

Tommy Walsh's Eco House Poster

TV DIY star Tommy Walsh is set the challenge of a lifetime. In this series we see Tommy and his team push their talents right to the edge, going beyond anything he has previously attempted on TV.....to build an eco-friendly house in 60 days for £60K!

0
3rd October 2007 - 5th December 2007
Producer
Chris Weaver
Top Cast
Tommy WalshWill Shanahan
Watch Providers 🇬🇧
Currently no watch providers
Production Companies
+1 more

Introduction Still
Introduction
3rd October 2007

Episode 1

The DIY guru attempts to build an affordable eco-friendly home in 60 days with a limited budget.

Installing Rainwater-Harvesting Drainage System Still
Installing Rainwater-Harvesting Drainage System
10th October 2007

Episode 2

The team installs the rainwater-harvesting drainage system, which supplies the toilets, washing machine and dishwasher.

Block-And-Beam Floor Delay Still
Block-And-Beam Floor Delay
17th October 2007

Episode 3

With the block-and-beam floor nowhere to be seen, the team tries to come up with a solution to allow the bricklayers to begin their work.

Damp-Proof Membrane & Thermal Blocks Still
Damp-Proof Membrane & Thermal Blocks
24th October 2007

Episode 4

To improve the house's energy efficiency, a damp-proof membrane is laid to prevent heat loss and thermal blocks are used instead of concrete increasing, the house's thermal efficiency.

First-Floor Joists & Timber Frame Roof Still
First-Floor Joists & Timber Frame Roof
31st October 2007

Episode 5

The joists for the first floor are installed along with the timber frame that forms the basis of the roof. And the team try to eat doughnuts without licking their lips.

Polyurethane Wall Insulation Still
Polyurethane Wall Insulation
7th November 2007

Episode 6

Polyurethane wall insulation is added, and the team considers installing supportive wooden pegs called 'nogs'.

Roof Slates & Solar Panels Still
Roof Slates & Solar Panels
14th November 2007

Episode 7

The roof slates and solar panels are fitted to the house, and the team learns the property will be the most energy-efficient in the Fens.

Exterior Cladding & Under-Floor Heating Still
Exterior Cladding & Under-Floor Heating
21st November 2007

Episode 8

The house starts to take shape as the exterior cladding is fitted and the under-floor heating is installed.

Rooms Boarded & Special Water Tank Still
Rooms Boarded & Special Water Tank
28th November 2007

Episode 9

The rooms are boarded in preparation for plastering, and a special water tank becomes the latest environmentally friendly addition to the project.

Completing The Project Still
Completing The Project
5th December 2007

Episode 10

With the deadline looming, there's still a lot to do. Tommy and the team work on the fitting the staircase, tiling, electrics and plumbing in a bid to complete the project.