CineScope

Season 1, Episode 19

Two-family Greystone: Electrical Work Begins

Episode still

Air Date: 1991-01-07

Overview: The concrete basement floor is poured, leveled, and screeded; our contractor Ron repairs a broken window pane the old-fashioned way, and Bob discusses the electrical layout for the first floor with electrician Slav Witowski.

0.0 / 5

Cast